WattPick Solar logo
WattPick SolarEPC · MNRE & DISCOM APPROVED
Get a quote
SERVICE AREA  ·  मंदसौर

Solar company in Mandsaur — from 3 kW rooftops to 2 MW PM-KUSUM plants.

Mandsaur district is where our largest plants are. We built the 2 MW Shree Leela Devi Solar Plant at Balaguda end to end, plus plants at Nimbod and Laxmi Solar Energy Balaguda 2. We also install PM Surya Ghar rooftops in Mandsaur city, Daloda and surrounding villages.

मंदसौर जिले में बालागुड़ा और निंबोद के मेगावाट कुसुम प्लांट से लेकर घरों की छत तक — वाटपिक सोलर की टीम हर काम खुद करती है।

Call +91 99265 25830 ⚡ Saving Calculator →
ROOFTOP

PM Surya Ghar

1–10 kW home systems with central subsidy up to ₹78,000, application and net metering handled for you.

COMMERCIAL

Shops, factories, institutions

10 kW–1 MW with net metering, accelerated depreciation and GST input-tax credit.

FARMERS

PM-KUSUM A & C

500 kW–2 MW ground-mounted plants with PPA support and 11 kV grid connection.

LOCAL PROOF

Projects in Mandsaur district

ProjectCapacityLocationScopeStatus
Shree Leela Devi Solar Plant2.10 MW DC / 2.00 MW ACBalaguda, MalhargarhTurnkey EPC, 11 kV line & commissioningCompleted · COD 17.03.2026
Laxmi Solar Energy Balaguda 22.40 MW DC / 2.00 MW ACBalagudaTurnkey ground-mount EPCCompleted
Nimbod Solar Plants I & II1.1 MW + 1.2 MWNimbodPM-KUSUM A, 11 kV turnkey EPCCompleted
Dalodasagra, Hanumantiya, Semliyaheera, Upervada—Mandsaur districtEngineering design & PVSystDesign
Residential rooftops3–5 kW eachMandsaur, DalodaPM Surya Ghar rooftop + subsidyCompleted
2.0 MW ground-mounted solar array at Balaguda, Mandsaur
Balaguda2.0 MW AC
Ground-mounted solar array at Nimbod, Mandsaur
Nimbod1.1–1.2 MW
Rooftop solar installation in Mandsaur
Mandsaur3 kW rooftop

The Shree Leela Devi plant at Balaguda exported 11,36,160 kWh to the grid in its first 106 days (March–June 2026), with an average CUF of 22.32%, from an independent generation and billing report. The full numbers are on our Projects page. Our directors have also worked on transmission lines and transformers across Mandsaur district since 2013, which is why 11 kV evacuation and substation work is done in-house.

For homes in Mandsaur city and Daloda we install PM Surya Ghar systems, typically 3–5 kW, and handle the MPPKVVCL net-meter process and the subsidy of up to ₹78,000.

See every project on our Projects page, and the full list of what we do on Services.

QUESTIONS FROM MANDSAUR

Common questions

Do you build PM-KUSUM Component-A plants in Mandsaur district?

Yes. We built the plants at Balaguda and Nimbod as turnkey EPC, and we are doing engineering design for projects at Dalodasagra, Hanumantiya, Semliyaheera and Upervada.

What does a 2 MW solar plant generate in Mandsaur?

Our Balaguda plant averaged about 10,718 kWh per day in its first 106 days. Actual output depends on the site, the design and the season; we give a PVSyst estimate for your land before you invest.

Do you install rooftop solar in Mandsaur city?

Yes, under PM Surya Ghar with the ₹78,000 subsidy, as well as commercial rooftops for shops and factories.

Free site survey in Mandsaur

Call +91 99265 25830 or +91 62619 38766, or send us your electricity bill on WhatsApp.

WhatsApp us ⚡ Saving Calculator Enquiry form

Nearby: Solar in Neemuch · Solar in Manasa · Solar in Ratlam · All service areas